Sign in Subscribe

Maynard Select Board Places $612,000 School Override on May 27 Ballot

MAYNARD -- April 15, 2025, Maynard Select Board unanimously placed a $612,000 school operating override on a May 27 special town election ballot, pairing it with a $200,000 override for senior center operations for a combined $812,000 ballot ask. The board arrived at the $612,000 figure by directing $263,000 in projected health insurance premium savings, generated by a plan design change in response to a proposed 9.92 percent rate increase, toward the school budget, dropping the school committee's original $650,000 request and eliminating a proposed second-year override of $225,000 for FY27. School Committee Chair Natasha Rivier told the board the district faces roughly three to four unfilled positions even at the $612,000 level, and warned the board not to go below that floor because of obligations under a paraprofessional union contract. The board also voted 4-0 to approve a 9 percent water and sewer rate increase effective July 1, with member David Gavin recusing himself because he lives in the area affected by historically discolored water, and approved a $495,000 engineering contract with Stantec Consulting Services Inc. for full design of the Powder Mill Road sewer pump station, funded entirely by a state MassWorks grant.

Keep reading with a 14-day free trial

Subscribe to Maynard News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Maynard News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe